Energy from waste. Protein from insects. AI Compute. One platform.
We are building an integrated circular bioeconomy facility in Poland: a 400 kW biogas plant as Phase I, with optional extensions — a Black Soldier Fly insect farm and an AI Compute centre.
Stable, regulated revenue from a 15-year feed-in tariff · simple operating model · long-term partnerships with local farms.
What we build and why.
AInsekt Farm is a long-term infrastructure venture in renewable energy and circular bioeconomy. We are not chasing quick returns — we are building an asset that generates stable, regulated revenue for 15 years and creates real value for local agriculture.
Goal
Build and commission a standalone 400 kW biogas CHP plant by September 2029 — producing 2,452 MWh per year of controllable 24/7 baseload, independent of weather.
Mission
Close the loop of organic waste in Polish agriculture. Every ton of substrate from a local farm — potatoes, silage, apples — becomes energy, heat and organic fertilizer that returns to the same fields.
Vision
A network of sister SPVs across Poland — each biogas plant a standalone, self-financing unit. Poland as the reference market for scaling the model across Central Europe through 2030 and beyond.
Phase I is a standalone asset. Phases II and III are additional growth.
The 400 kW biogas plant defends itself economically — without further phases. The optional insect farm and AI Compute centre are financed exclusively from Phase I cash flow and additional public support.
400 kW in high-efficiency cogeneration. 15-year guaranteed tariff.
CSTR reactor with mesophilic fermentation at 38–42°C · main fermenter 1,500 m³ and post-fermenter 1,200 m³ · 35-day retention · 2,452 MWh per year of controllable 24/7 baseload.
Circular-economy waste marketplace.
FLIK is an operational app connecting biogas plants, supermarkets, farmers and businesses. It is the direct, operational channel for sourcing agricultural substrate for Phase I.
Real-time map · automated reservations · optimized delivery routes · CSRD ESG reports · audit trail for grant applications.
Public renewables support and own equity.
The Phase I project qualifies for Polish and EU renewables support programmes. Applications are in preparation — target submission in the 2027 call cycle. The financing strategy combines investment support, a preferential loan and investor equity.
Proporcje docelowe — finalna struktura zostanie potwierdzona po pozytywnej decyzji o przyznaniu wsparcia inwestycyjnego.
27 months to first megawatt-hour.
Built in Poland. Operationally and in regulation.

Phase I defends itself.
Phases II and III give the upside.
AInsekt Farm Sp. z o.o. — a 400 kW biogas plant as a standalone, self-financing asset. With the option to expand into a Black Soldier Fly insect farm (Phase II) and an AI Compute centre (Phase III).
Full Business Plan, 15-year financial model and sensitivity analysis available after signing a non-disclosure agreement (NDA). In-person meetings preferred.
